We’ve settled into the new site fairly well I think. A million and one details to be seen to just to set up a temporary site office, which we’ll only be occupying for six months. I’ve been walking around the building, and have been impressed with what I’ve seen thus far. Compared with the previous place, the walls here are straight, the plasterwork is immaculate, the windows are double glazed, and not wavy. The overall quality of build is something to write home about.
Now to see if we can manage to shoehorn a pair of linear accelerators in the fucking bunker located in the basement. The main contractor went ahead and built the nuclear bunker, wihtout considering how the lin-acs are going to be installed. The longest single component is a few centimeters shy of 3 meters, and it’s going to be a bastard getting it to fit around 1.8 meter wide corridors.
Or we could lift the roof off the bunker and drop it in with a crane. Which, when the client’s project director asked me how we were going to lift it, made his face blanch. Because my solution involves using dynamite.
- Posted in : Work Bitching
- Author : thesnark
Comments»
no comments yet - be the first?